Following seven hours of continuous concrete pouring, the Ganjing River Double-Track Super Major Bridge, a challenging and critical project on the new Chongqing-Wanzhou High-speed Railway, was successfully closed (joined), laying a solid foundation for the timely opening of the entire line.
